Address : No 1, Cai Lan Road, Bai Chay Ward, Ha Long City, Quang Ninh Province, Vietnam.
Square : 18,1ha including container yard.
Total berth lenght : 594 meters.
Water Depth : 10m channel draft at low tide; 13m alongside.
Berths : 3 berths (#2, 3 & 4 in Cai Lan Port)
Truck lanes : 8 (4 lanes in/4 lanes out)
Commodities Handled : Containers, break-bulk cargo, project cargo, RORO and other cargo on inducement.
Starting operation : August 2012
CICT Warehouse
Square meter: 8,000 m2
Divided into 04 partitions of 2,000 m2 each.
Capacity: Approx. 36,000 MT of cargo.
Operation started September, 2019.
Equipment: On-top conveyor system with productivity 300 MT/hour/conveyor.
Location: Berth #2.